Let’s Start Work
Together
Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.
Brochure
Download our document to see specific data of the service and how we work.
SHK INNER BRAND
SHK INNER offers high-quality PPR-C Pipes & Fittings designed for safe, durable, and sustainable piping solutions. Manufactured using premium-grade raw materials sourced from globally trusted suppliers, our products ensure superior performance for residential, commercial, and industrial applications.
Infrastructure
We have with us well developed infrastructure facilities that include advanced technology based machinery and a Specialized Research & Development Unit. We have Multiple Extrusion and Injection Moulding Units for PPR-C Pipes & Fittings. This helps us to achieve columinous and qualitative production. Our plant is equipped with the most sophisticated & advance machineries to manufacture the products confirming to the standards laid down by Indian and International standard requirements and well equipped with in-house Testing & Quality Assurance Facilities.
UV Stabilized PPR-C Top layer:
- UV Stabilizers contains various chemical properties, which gives the protection against UV light by various chemical mechanisms.
- Colors like Black, Green already have good resistance to UV rays, but addition of UV stabilizers further enhance the light and thermal stability of product.
- UV stabilizers impart long term durability and enhance life of the product.
Anti-microbial PPR-C Inner Layer
Anti-Microbial Layer Prevents the growth of Bacteria/Algae/Microbes etc inside the pipe which makes suitable for the Usage of any Clean Water or Liquid Food Supply Application.
Properties
• Lighter in Weight
• Longer Service Life
• Non-Scaling
• Anti-Corrosive
• Low Laying Time
• Recyclable Material
• Negligible Heat Loss
• Wide Operating Temperature Range: (-8) to 95°C
• Leak Proof (Socket-Fusion Jointing)
• Very Low Thermal Conductivity (0.23 W/mK)
• Very Low Frictional Factor (1.5 Ft / 100 Ft)
• No Electrical Conductivity
• Good Chemical Resistance
Fields of Application
• Hot/Cold Water Supply
• Chemical Plants
• Cooling Towers & Condensor Lines
• Chilled Water Supply
• Pharmaceutical Industries (USFDA Approved)
• Effluent/ Water/Sewage Treatment Plants
• RO Drinking Water Plant
• Solar Water Heater
• Fire Application
Available Colors
SHK INNER Flame Retardant Pipes
UL 94 FLAME RETARDANT CHARACTERISTIC
| Test Criteria (UL94 - IEC 60707) | Requirement |
|---|---|
| Burning time of each individual test specimen(s) (after first and second flame applications) | ≤ 30 s |
| Total burning time (10 flame applications) | ≤ 250 s |
| Burning and afterglow times after second flame application | ≤ 60 s |
| Dripping of burning specimens (ignition of cotton batting) | Yes |
| Combustion up to holding clamp (specimens completely burned) | No |
Application
Available Colors
TECHNICAL & COMMERCIAL COMPARISON
| Properties | MS Pipes | CPVC Pipes | PPR Pipes |
|---|---|---|---|
| Service Life | 3–5 years | 15–20 years | 50 years |
| Food Grade | Poor due to corrosion issues | The solution used for jointing the pipes might contaminate the water. Non-hygienic in nature. | Hygienic, CFTRI approved – can supply clean water and liquid food. |
| Leakage | High chance | High chance due to solution-based jointing | Negligible chance due to socket fusion jointing |
| Heat Loss | High | Negligible | Negligible |
| Thermal Conductivity | Very High (45 W/mK) | Low (0.3 W/mK) | Low (0.23 W/mK) |
| Insulation Requirement in Chilled Water Supply | More insulation thickness required due to high thermal conductivity | Pipes not recommended for chilled water supply | Lower insulation thickness than MS as thermal conductivity is quite low |
| Maintenance Cost | High after 3–4 years | High after 5–6 years | Negligible up to 15–20 years |
| Corrosion Resistance | Nil | Excellent | Excellent |
| Friction | Very High | Low, approx. 4 ft/100 ft | Negligible due to smooth layer, approx. 1.5 ft/100 ft |
| Weight | Very heavy | Very light due to which transportation cost decreases by 3 times | Very light due to which transportation cost decreases by 3 times |
| Painting Cost | Additionally high for painting the pipes according to standards | None | None |
| Young’s Modulus | NA | Approx. 3275 MPa, making the pipe rigid and brittle | Approx. 850 MPa, making the pipes tough and ductile |
| Temperature Resistance | Applicable for higher temperatures as well | 10°C to 80°C (adhesive joints used for joints can be used only up to 60°C) | -8°C to 95°C |
| CAPEX Costing | Higher than PPR-C | Higher than PPR-C | Very Low CAPEX Costing |
| OPEX Costing | Higher than PPR-C because of high maintenance | Higher than PPR-C | Very Low OPEX Costing because of negligible maintenance |
| Installation Time | Very high because of welding joints and more manpower required | Negligible as solution-based joints | Low because of socket fusion jointing |
SHK INNER PPR-C Triple Layer Pipes & Fittings
| Type | Size |
|---|---|
| PN 06 Pipes | 200 mm to 400 mm |
| PN 10 Pipes | 32 mm to 315 mm |
| PN 16 Pipes | 20 mm to 315 mm |
| PN 20 Pipes | 20 mm to 315 mm |
SHK INNER Pneumato PPR-C Pipes & Fittings
| Type | Size |
|---|---|
| PN 06 Pipes | 200 mm to 400 mm |
| PN 10 Pipes | 50 mm to 315 mm |
| PN 16 Pipes | 20 mm to 315 mm |
| PN 20 Pipes | 20 mm to 315 mm |
PPR-C GREEN FITTINGS

Socket

Elbow 90 degree

Elbow 45 degree

Tee

End Cap

Flange Core/Stubend

Reducer

Reducer Tee

PPR-Flange

M/S Powder Coated Flange

Reducing Elbow

Union

Long Bend

F T Saddle

Saddle

Wall Camp

F T Socket

M T Socket

F T Union

M T Union

F T Elbow

M T Elbow

F T Tee

M T Tee

Gate Valve

Plastic Body Ball Valve

Tank Connector

Long Plug

Gate Valve
WELDING PROCESS
Cutting
• Cut the pipe at right angle to its axis using burr-free cutter
• Ensure that pipe is free from burrs or cutting chips
• Clean the pipe & fitting perfectly before welding.
• Mark welding depth at the end of pipe
Heating
• Mount the suitable Dies (Socket and Pucnh) on heating element of welding machine according to the diameter of pipe and fitting to be welded
• Connect the welding machine to 220 Volts A.C. power supply d
• Select 260 C temperature on the welding machine hermostat d
• Wait for reaching the required working temperature d
• Insert the pipe and the fitting in the Dies (i.e. Socket and Punch respectively) by exerting light pressure d
• Heat both pipe & fitting as per the size and time given in the following table
Welding
• After heating, quickly insert pipe into the fitting by exerting light pressure
• Any misalignment should be corrected immediately after insertion to avoid any stress in the weld. This type of connection ensures perfect sealing even under the hard working conditions.
Note :
1. Avoid air draughts during welding to avoid stress in the welds.
2. During site welding, keep the welding set at a right angle to the pipe and fitting in order to avoid partial welding
| Pipe Dia. (mm) | Welding Depth (mm) | Heating Time (Sec) | Welding Time (Sec) | Cooling Time (Min) |
|---|---|---|---|---|
| 20 | 14.50 | 6 | 4 | 2 |
| 25 | 16.00 | 7 | 4 | 2 |
| 32 | 18.00 | 8 | 6 | 4 |
| 40 | 20.50 | 12 | 6 | 4 |
| 50 | 23.50 | 18 | 6 | 4 |
| 63 | 27.50 | 24 | 8 | 6 |
| 75 | 30.00 | 30 | 8 | 6 |
| 90 | 33.00 | 40 | 8 | 6 |
| 110 | 37.00 | 52 | 10 | 8 |
QUALITY CERTIFICATES

